fbpx Skip to the content
The Maryland-National Capital Park and Planning Commission

Long Branch Trail Extension to Carroll Avenue

ariel view of long branch trail

Click on the image to view larger.

Project Description

This project will evaluate the proposed construction of a hard surface trail extension from the end of the existing Long Branch Trail to Carroll Avenue. The project area is located in the Long Branch Stream Valley Park in Stream Valley Unit #1, near the intersection of Long Branch Parkway and Carroll Avenue in Takoma Park. The Long Branch Trail currently ends at the dead-end of Long Branch Parkway. Currently, there is a people’s choice trail (unsanctioned trail) that parallels the Long Branch Stream Valley Park on the northeast side of the stream to Carroll Avenue. The majority of the potential extension alignment is on parkland, while some small areas may be within Montgomery County Department of Transportation (MCDOT) and/or SHA right-of-way (pending an approved alignment).

The project location contains some environmentally sensitive areas, including some mature trees and forested areas, groundwater seeps, localized erosion features, and abundant non-native/invasive plants in some areas. There are excellent opportunities in this area for incorporating environmental enhancements, including tree replacement, removal of non-native/invasive (NNI) plants, floodplain, and stream buffer habitat enhancement, and restoration replanting.

Background

This project is one of several projects planned in the Long Branch Stream Valley Park corridor with a goal of creating a continuous and updated Long Branch Trail from Piney Branch Road to Carroll Avenue. This project will help improve trail connectivity in the greater Long Branch area.

The existing people’s choice trail to Carroll Avenue shows significant use and there are maintenance concerns with the area. There is a history of tree loss in this area, the general area has poor drainage, and the foot trail has widened over time leading to loss of vegetation with localized erosion. Therefore, the second goal of this project is to enhance pedestrian and cyclist safety while also enhancing park resources by incorporating restorative plantings, NNI removal, drainage improvements, and floodplain habitat enhancements.

Status/Project Update

In August 2020, Parks staff started began the concept analysis phase of the project.  An informational meeting is scheduled for June 16, 2021 to present preliminary concept plans to the community.

Dates and times are subject to change.  Please contact the project manager for more information.

Project TimelineProject StageProject Resources
Summer 2020Survey and preliminary assessment of site conditions developed
– Concept analysis
Completed
June 16, 2021Online Informational Meeting
June 2022Design PhaseIn progress
Fall 2024Construction PhaseN/A
Long Branch Trail Extension to Carroll Avenue
Last Updated: April 8, 2024