Project Description
This project will replace the existing playground with a new playground layout and new playground equipment. The new playground is expected to measure 3,500 to 5,000 square feet. Playground renovation projects typically include new play equipment (e.g., swings, play structures, and freestanding pieces tailored to 2-5 and 5-12 age groups), stormwater management, site furnishings, site access improvements and other associated upgrades.
NOTE: This park’s basketball court and tennis courts are also scheduled for pavement resurfacing, restriping, and new nets/goals. These improvements will occur on a similar schedule as the playground renovation.
Background
Merrimac Neighborhood Park is located at 6415 Winston Drive, Bethesda, MD, 20817. The approximately 3,000 square foot playground is at the highest elevation in the park and provides pleasant views into courts, open lawn, and forested areas. However, the playground’s steep slopes cause drainage challenges, maintenance needs and access constraints. The playground and its four components (arch climber, 2-5 climber, freestanding slide, pair of swings) are due for replacement.
In addition to the playground, this popular neighborhood park includes two tennis courts, a basketball court, a multipurpose field, 18-space parking lot and extensive forest and tree canopy. Paved walkways and natural surface trails connect the park to the surrounding Bannockburn, Merrimack, and Goldsboro neighborhoods.
Status/Project Update
The playground renovation project process is underway; community outreach will begin in Spring 2024. Montgomery Parks is encouraging interested residents to participate! Please see below for more information and continue to check this project website for future updates.
Calendar and Meeting Notes
*Dates and times are subject to change. Please contact the Project Manager for the latest update.
Dates | Notes and Project Resources |
---|---|
Winter 2023 – 2024 | Project Initiation, including site analysis, topographic survey, preliminary review |
March 20, 2024 | View March 20 Community Meeting Recording View the meeting notes (accessible pdf) |
March 20 – April 21, 2024 | Take the Open Town Hall Survey |
Summer 2024 | Concept Plan Development |
Fall 2024 – Spring 2025 (anticipated) | Detailed Design and Construction Documents |
Summer 2025 (anticipated) | Construction expected to begin |